Windows should be decided before openings are finished.

Early integration reduces site improvisation and aligns joinery with insulation, sills, shutters and finishes.

PANORAMA FERESTRE · SINCE 2017

Planning

We clarify dimensions and details before plastering.

Coordination

We work with the architect, contractor and energy designer.

Stages

Measurement, production and installation follow the site programme.

What we prepare together

We begin with drawings and elevations, verify openings and define responsibilities for supports, waterproofing, power and finishes.

  • +Window schedule and opening directions
  • +Position within the insulation layer
  • +Thresholds, sliders and floor levels
  • +Wiring for shutters and automation
  • +Protection after installation
FAQ

Short answers to important questions.

When should I request a quote?+

Ideally before openings are completed, especially for sliders, integrated shutters and installation within insulation.

Do you work from the architect's drawings?+

Yes, then confirm every production dimension through site measurement.